Basement Waterproofing

Completion

December xxxx

Location

Villa, The Peak

Contract Sum

HKD$ HK$ xxx,xxx

Area

xxxx sq meters

Part A: Concrete surface preparation

1. Smoothing even area and scratches using patching mortar

2. Cleaning and drying of the smoothened concrete surface.

3. Removal of any “spikes” from the concrete / screed

 

Part B: Basement waterproofing system (3,500ft2)

1. All joints and inner corners are protected with angle fillet and web.

2. Apply first layer of ARDEX WPM 300 @ 1mm

3. Apply second layer of ARDEX WPM  300 @1mm to achieve 2mm waterproofing membrane.